Advice & Local Guides · Pinnacle Building and Joinery · 4 September 2026
The cheapest quotation is not necessarily the least expensive route to a finished room. It may include less work, different materials or allowances that will change later. Put the documents side by side and compare the scope before comparing the total.
Give everyone the same brief
Supply the same drawings, photographs, product schedule and description of the work to each builder. Identify which version of the drawings is current. If one contractor has priced a revised layout and another has not, the comparison is already unreliable.
Tell bidders which items you intend to supply yourself. Ask them to state any assumptions that affect fitting, delivery and responsibility for suitability.
Check these items line by line
- Preparation, protection of existing rooms and site setup.
- Removal of existing materials and waste disposal.
- Groundworks, structural work and making good.
- Plumbing, electrical work and any specialist trades.
- Plastering, decorating, flooring and final finishes.
- Fixtures and products, with a clear specification or allowance.
- VAT and any clearly excluded fees or services.
Ask what “finished” means. For example, “kitchen installation” might not include decoration, floor preparation or fitting appliances supplied by someone else. Specific wording prevents different expectations at handover.
Understand allowances and exclusions
An allowance is a figure included while a detail remains undecided. Ask what it is based on, how it will be adjusted and what evidence will support a change. Large allowances can make an early total look precise when substantial choices remain open.
Keep a separate list of exclusions. Add the likely cost of excluded items to your comparison once you have reliable figures, rather than treating them as optional simply because they are absent from the quote.
Discuss programme, payments and changes
Ask for proposed stages, dependencies and a written payment schedule related to the agreed work. Find out who will be your day-to-day contact and how decisions are recorded. Agree how changes will be priced and approved before additional work proceeds.
Ask what documentation and checks will be provided at completion, as applicable to the work. Keep the agreed scope, quotation and subsequent changes together.
Resolve the gaps before choosing
If one quotation differs substantially, ask the builder to explain why. It may reflect a different method or specification, or it may reveal an omission. A useful follow-up question is: “What would I still need to arrange or pay for to reach the finished result shown in the drawings?”